Contractors are entitled to timely payment for work executed in line with the mode of payment stated in the contract document. This contributes to continuous involvement of contractor in construction businesses and proper cash flow; in order words it prevents contractors’ insolvency. There are anecdotal evidences about the fact that untimely payment of construction works is like a cankerworm that have eaten deep into the fabric of the construction industry in developed and developing countries. This study therefore assessed the barriers of timely payment in public building projects in Nigeria using a survey of selected construction participants that have been involved in the delivery of public projects within the last sixteen years. A total of 23 barriers were assessed and factor analysis was used to analyse the data gathered. The study concludes that the major barriers of timely payment of public building projects within the study area can be categorised under the project management barriers, client barriers, consultant barriers, economy barriers, project environment barriers and contractor barriers. The study further recommends that clients’ should stick to the agreed pace of payment for valued work done by contractors; and also make clients to pay interest for lateness in honouring payment certificate. Effective planning must be carried out from the onset of the project, while having the right mix of construction team is also necessary. It is believed that the findings of this study will go a long way in helping those responsible for the delivery of public building projects to deliver successful project through timely payment to contractors.
- References
- Downloads
- Published
- 2019-05-14
- Section
- Articles
- License
-
Copyright
With the submission of a manuscript, the corresponding author confirms that the manuscript is not under consideration by another journal. With the acceptance of a manuscript, the Journal reserves the exclusive right of publication and dissemination of the information contained in the article. The veracity of the paper and all the claims therein is solely the opinion of the authors not the journal.
How to Cite
Similar Articles
- S. O. Olatunji, Drivers of Timely Payment in Public Building Projects in Nigeria , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 13 No. 2 (2019): FUTA Journal of Engineering and Engineering Technology
- O. A. Awodele, Appraisal of Risk Identification and Response Techniques adopted on Building Projects in Rivers State, Nigeria , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 10 No. 1 (2016): FUTA Journal of Engineering and Engineering Technology
- O. Olayemi Simo-Oke, Alaba Ogunbameru, J. Imisi, Bridging Public Infrastructure-Finance Gap in Ondo State, Nigeria: Does Pension Fund Matter? , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 10 No. 2 (2016): FUTA Journal of Engineering and Engineering Technology
- J. J. Obembe, Investigation into Causes of Project Failure in Akure Metropolis, Ondo State, Nigeria , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 10 No. 2 (2016): FUTA Journal of Engineering and Engineering Technology
- S. A. Alabi, I. A. Arighaye, J. O. Afolayan, PROGRESSIVE FAILURE ANALYSIS OF MULTI-STOREY REINFORCED CONCRETE BUILDINGS UNDER DIFFERENTIAL SETTLEMENT , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 14 No. 1 (2020): FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY
- M. M. Melodi, O. S. Adekinya, Assessment of Cost Effectiveness of Borehole Drilling in Oyo State, Nigeria , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 10 No. 1 (2016): FUTA Journal of Engineering and Engineering Technology
- E. O. Aiyewalehinmi, O. S. Aderinola, M. O. Tanimola, An Investigation into Building Functional Failures in Nigeria (A Case Study of Ibadan, Oyo State Capital) , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 9 No. 2 (2015): FUTA Journal of Engineering and Engineering Technology
- A. A. Ponnle, S. K. Ani, Assessment of Exposure to Indoor Power Frequency Magnetic Fields: SEET Building and Engineering Laboratories, FUTA , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 13 No. 1 (2019): FUTA Journal of Engineering and Engineering Technology
- E O Olutomilola, A Omoaka, THEORETICAL DESIGN OF A PLANTAIN PEELING MACHINE , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 12 No. 2 (2018): FUTA Journal of Engineering and Engineering Technology
- O. O. Olubanjo, A. E. Alade, Development of a Low Cost Greenhouse and Drip Hydroponic Structure for Vegetable Production in South-West Nigeria , FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY: Vol. 14 No. 1 (2020): FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY
You may also start an advanced similarity search for this article.