COST EVALUATION FOR ASPHALT PRODUCTION IN SELECTED QUARRIES

Authors
  • A. O. Owolabi

    Department of Mining Engineering, Federal University of Technology, Akure, Nigeria

  • P. A. Adesida

    Department of Mining Engineering, Federal University of Technology, Akure, Nigeria

Keywords:
Cost evaluation, asphalt products, quarries, aggregates
Abstract

The major use of asphalt is in construction of road where it is usually used as the glue or binder mixed with different aggregate sizes to form asphalt concrete. Its other uses are for bituminous waterproofing products, including production of roofing felt and for sealing.fiat roofs. The current population increase and the growth of living standards globally have led to increasing demand for asphalt products. Competition certainly occurs among producers in the industry as demand increases. Competition in the market is influenced by prices which requires new measures and cost analysis on production costs. Therefore, cost evaluation is very significant in mining activities. In this study, variables involved in the production of asphalt products were examined and evaluated for their influence on the total cost of asphalt products based on two selected quarries (Quarry A and B). Based on the data collected from the study areas, it was found that the total operating expenses for producing 20 tons of wearing course of asphalt at Quarry A was higher than that of Quarry B by N 101,758.125, while its total selling price was found to be lower by N 50,000. Thus, the net profit of Quarry A is less than that of Quarry B by N 151,758.125. On the basis of the cost evaluation of asphalt products, the main factors driving costs have been analyzed, and their influences on the cost have been established. The study indicated that cost analysis is vital in providing information on changes in production costs.

References
Cover Image
Downloads
Published
2020-04-09
Section
Articles
License

Copyright

With the submission of a manuscript, the corresponding author confirms that the manuscript is not under consideration by another journal. With the acceptance of a manuscript, the Journal reserves the exclusive right of publication and dissemination of the information contained in the article. The veracity of the paper and all the claims therein is solely the opinion of the authors not the journal.

How to Cite

COST EVALUATION FOR ASPHALT PRODUCTION IN SELECTED QUARRIES . (2020). FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY, 14(1), 93-99. https://doi.org/10.51459/futajeet.2020.14.1.241

Similar Articles

1-10 of 61

You may also start an advanced similarity search for this article.