OPEN PIT OPTIMIZATION AND PRODUCTION SCHEDULING OF OKOBO COAL MINE, CENTRAL NIGERIA

Authors
  • Anthony T. Bolarinwa

    Department of Geology, University of Ibadan, Ibadan, Nigeria

  • Gideon C. Nwafor

    Department of Geology, University of Ibadan, Ibadan, Nigeria

Keywords:
Open pit mining, Geologic model, Mine planning, Production scheduling, Okobo coal
Abstract

The Okobo coal in Enjema District of Ankpa Local Government Area of Kogi State, Nigeria is a near surface deposit that is mined through the open pit method. In this investigation, models and plans of the Okobo coal mine produced, using Minex® Gemcom Software, were aligned with depth, strip ratio and optimum pit limits with the aim of defining the most profitable extraction sequence of the coal that will produce maximum possible discounted profit under certain physical and operational constraints. Sandstones, shale and clays constitute the overburden. The topsoil thickness ranged from 0.1 to 0.5 m. Coal recovery was estimated from drill data to be 95%, with losses occurring primarily at the base of the coal seam. Eight (8) expansion pits from the most valuable to the least valuable material were identified using the optimizer. Parametric analysis of mining and processing costs generated an optimized pushback of 1.7 million tonnes of 20.79 Air Dried (AD) MJ/kg coal at 12.35 stripping ratio in the $65 incremental pit. Areas with higher stripping ratio might be more suitable for underground mining. Implementation of these application would reduce cost, improved the Net Present Value (NPV) of the operation and selection of the most economical areas for mining. It is recommended that the mine pits be developed from north to south for optimum productivity.

References
Cover Image
Futajeet Volume  12 Issue 1
Downloads
Published
2019-04-29
Section
Articles
License

Copyright

With the submission of a manuscript, the corresponding author confirms that the manuscript is not under consideration by another journal. With the acceptance of a manuscript, the Journal reserves the exclusive right of publication and dissemination of the information contained in the article. The veracity of the paper and all the claims therein is solely the opinion of the authors not the journal.

How to Cite

OPEN PIT OPTIMIZATION AND PRODUCTION SCHEDULING OF OKOBO COAL MINE, CENTRAL NIGERIA. (2019). FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY, 12(1), 115-124. https://doi.org/10.51459/futajeet.2018.12.1.76

Similar Articles

1-10 of 84

You may also start an advanced similarity search for this article.