PRODUCTION ANALYSIS OF FIVE-SPOT MISCIBLE DISPLACEMENT SCHEMES IN GAS CONDENSATE RESERVOIRS. (2025). FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY, 19(1), 114-125. https://doi.org/10.51459/futajeet.2025.19.1.467