A MULTI-OBJECTIVE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM USING GENETIC ALGORITHM. (2019). FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY, 12(1), 90-101. https://doi.org/10.51459/futajeet.2018.12.1.73