OPEN PIT OPTIMIZATION AND PRODUCTION SCHEDULING OF OKOBO COAL MINE, CENTRAL NIGERIA. (2019). FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY, 12(1), 115-124. https://doi.org/10.51459/futajeet.2018.12.1.76