“A MULTI-OBJECTIVE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM USING GENETIC ALGORITHM”. FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY, vol. 12, no. 1, Apr. 2019, pp. 90-101, https://doi.org/10.51459/futajeet.2018.12.1.73.