“OPEN PIT OPTIMIZATION AND PRODUCTION SCHEDULING OF OKOBO COAL MINE, CENTRAL NIGERIA”. FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY, vol. 12, no. 1, Apr. 2019, pp. 115-24, https://doi.org/10.51459/futajeet.2018.12.1.76.