“A MULTI-OBJECTIVE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM USING GENETIC ALGORITHM” (2019) FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY, 12(1), pp. 90–101. doi:10.51459/futajeet.2018.12.1.73.